On May 10, 2011, the Stone Quarry Factory in Baruunkharaa of Bayangol soum, Selenge aimag purchased 650,000 m 3 of stone from the pile, which was made at the result of
drilling, blasting, and excavated the rocky soil of the placer gold deposit of 100% Canadian- invested Boroo-Gold Mine, and acquired 1,200 m 2 of land by order of the Governor of
Bayangol soum; purchased a stone crushing plant capable of crushing and classifying the 120 m 3 of stone per hour from South Korea, installed 10 km of power lines, manufactured 1200-grade crushed stone with dimensions of 5 mm-10 mm, 10 mm-20 mm, and 20 mm-60 mm, and transported for 20 km on improved asphalt concrete roads, reserved and stocked in large quantities on its own land with the area of 2603 m 2 purposed for loading 40 semi-trailers in one shift, and supplies them to Ulaanbaatar Railway, Erdenet Mining Factory, and other larger customers. The Stone Quarry of Baruunkharaa is located 120 km from Ulaanbaatar, 100 km from Darkhan, and 20 km from Baruunkharaa. The company sells one m 3 of crushed mountain stone or railway sealant crushed stone with the size of 20 mm-60 mm at MNT34,000-43,000.
The quartz sand deposit located 5 km east of the Kharaa river bridge of Baruunkharaa in Bayangol soum, Selenge aimag has rich deposit. The sand is transported on its own
railway in Baruunkharaa, and sold in Ulaanbaatar, Erdenet, and Baruunkharaa cities. Total reserves are currently estimated at 5,000,000 m 3 .
Product sales and markets:
The mountain rock crushing and sorting plant of Baruunkharaa is fully capable of not only selling the products of sand and gravel mixtures, and products of quartz sand deposits
located next to the Kharaa river to all cities along the railway of Mongolia, but also constructing a variety of factories for concrete structures, various buildings and
construction materials, and selling them to foreign and domestic markets. Moreover, the gas pipeline terminals to be installed from Russia to China, as well as the commercial highways connecting these two countries are being prepared to be installed at a distance of 1-2 km from our factory and the project proposals are under the development
and thus, it is fully possible to supply huge amount of sand, gravel, and concrete structures to this large Mega project. Furthermore, the demand and requirements to construct a
concentrating plant at the sand deposit and supply cleaned and enriched sand in large quantities to large mining projects are increasing. At present, one m 3 of sand (sand and gravel mixture) is sold at MNT22,500.